Joseph Steinberg is founder and CEO of Plan A Services, which provides as-built documentation and 3D laser scanning for renovation and retrofit projects on the East Coast. He argues that teams should verify a building’s actual conditions before pricing work from existing drawings, while acknowledging that scanning every room may not be necessary on every project.
A drawing can be a useful starting point, but Joseph Steinberg believes it should not be the sole basis for a renovation price: on-site verification can reveal discrepancies that reshape the planned work. He also recognizes that the extent of scanning should fit the building, rather than become a rigid requirement.
What’s one opinion about your industry that most of your peers would disagree with?
I’m of the opinion that they can be very detrimental if relied upon. I’d be surprised if there were many builders who wouldn’t happily quote work based on drawings supplied. Indeed, most would start the process with that information. I feel very strongly that you should always verify with the actual building, and would be reluctant to provide a figure based solely on drawings.
What convinced you? Tell us about the moment, client or result that changed your mind.
I quoted a renovation from a client’s plans and gave a fixed price. Once on site, there was a significant (around 18") discrepancy in the position of an existing wall, with consequential changes to all aspects of the proposed scheme. I was, of course, stuck with the figure I had quoted. So I always double-check. On a building of around 13 floors, discrepancies throughout the existing building meant that much of the proposed scheme as laid out by the architect was impossible.
What’s the usual way people in your field handle this, and what do you do instead?
Most would be happy to base a quotation on available drawings. Presumably it saves time, as it will generally be convenient for the client to supply this information. I prefer to quote to undertake all appropriate scans, produce a model or models suitable for further work, and then proceed based on actual information.
Obviously, this is not easy to sell to the client, as it seems that they will be paying for information which they already have. The alternative is to accept the risk of unforeseen circumstances arising during the course of the works.
Where has this view cost you, or where have you had to admit you were partly wrong?
I’m sure I’ve lost business as a result of clients being unwilling to pay for a "discovery" exercise. There will also have been instances, probably with smaller properties, where I’ve been overzealous in wanting to scan every room, when available information may well have been adequate. I stand by the general principle though, and only feel I was perhaps over enthusiastic and inflexible about how far to take it.
What should someone in your field stop doing, and what should they start doing?
I would be reluctant to place too much faith in any drawings provided upfront, no matter how well presented. I’d want first-hand knowledge of the building and only then proceed to provide a figure. Obviously this delays providing information to the client, but should guarantee a more reliable basis to complete the remainder of the project. I appreciate that this means facing up to client resistance at an earlier stage rather than discovering problems at a much more costly stage of the project.
Thank you to Joseph Steinberg and the team at Plan A Services for sharing an honest view with Leaders Perception readers.
Have a view your industry needs to hear?
Leaders Perception publishes interviews with business owners and leaders who see their industry differently. Five questions, about ten minutes, no calls. It is free and every completed interview gets published.