Why Daniel Ilinykh puts floor preparation before speed
Daniel Ilinykh is the owner and flooring contractor at Bay Way Flooring LLC, which provides flooring and tile installation, floor leveling and preparation, and shower waterproofing in Tampa Bay. Ilinykh argues that checking and preparing the floor deserves more attention than installation speed, while stressing that the work should match what each floor actually needs.
Ilinykh believes contractors should assess and prepare the floor before installing tile, rather than measure a job by daily square footage. The preparation should address real problems without adding unnecessary cost for the customer.
What’s one opinion about your industry that most of your peers would disagree with?
I don’t think finishing a flooring job faster makes you a better contractor. I’d rather spend another day getting the floor ready than start laying tile when I know something isn’t right.
You can buy the most expensive tile in the store, but that won’t fix what’s underneath it. To me, the work nobody sees after the installation is just as important as the finished floor.
What convinced you? Tell us about the moment, client or result that changed your mind.
It wasn’t really one particular job. It’s something you start to understand after working with different floors and seeing what’s underneath them.
A floor can look fine until you start checking it. Once you get down there with a straightedge, you might find high spots, low spots, or other problems that weren’t obvious at first.
That’s why I don’t like rushing into an installation without knowing what I’m working with.
What’s the usual way people in your field handle this, and what do you do instead?
There’s a lot of pressure in this business to finish one job and get to the next one. I understand that. We’re all running businesses.
But before I start installing tile, I want to know what the floor looks like, how flat it is, and what needs to be done to it. Sometimes that means grinding concrete; sometimes it means using a leveling compound.
Every floor is different. You can’t treat every job the same way just because you want to stick to a schedule.
Where has this view cost you, or where have you had to admit you were partly wrong?
The hard part is explaining why a job might take longer or cost more when the customer can’t really see what needs to be fixed.
It’s easy to compare two prices on paper. It’s a lot harder to compare what’s actually included in those prices.
At the same time, not every floor needs a ton of prep work. You have to know when something is necessary and when you’re just making more work for yourself and spending the customer’s money.
What should someone in your field stop doing, and what should they start doing?
Stop looking at every job in terms of how many square feet you can install in a day.
Spend more time checking the floor before you start. Explain to the customer what needs to be done and why. People are paying for a floor they might live with for the next 10 or 20 years, not just for a few days of installation.
I’d rather take the time to do it right than have to come back and fix something that could have been avoided.
Thank you to Daniel Ilinykh and the team at Bay Way Flooring LLC for sharing an honest view with Leaders Perception readers.
Have a view your industry needs to hear?
Leaders Perception publishes interviews with business owners and leaders who see their industry differently. Five questions, about ten minutes, no calls. It is free and every completed interview gets published.